A1A Locomotives Ltd "Keeping Brush Type 2 Traction Alive"
Preservation Story Away Workings MRC Butterley Archive Gen

      Last Update 10/05/08         

                                                                                  

                                                                             

THE NEXT PLANNED WORKINGS FOR 31271 WILL BE ON SUNDAY 18TH MAY AT NVR.

 

 

Current Location:

Wansford...Nene Valley Railway

Status:

In traffic

Planned Workings

31271 has worked all the rostered dates as planned at NVR in 2007.

2008 roster now available.

Planned Maintenance Routine...'B' exam carried out 29/02/08.

 

'ANDY DALBY MEMORIAL SPECIAL'.....05/04/08

 

31271 at Peterboro prior to working the 1530 to Wansford. This event raised £550 for the Neurological dept at the Royal Hallamshire Hospital in Sheffield. This was Andy's chosen charity....05/04/08

 

NVR DIESEL GALA.... 05/10/07 - 07/10/07

 

31271 with similarly livered 33063 await departure from Peterboro NV...06/10/07.

37518 leads 31271 at Wansford having just returned from Peterboro on an evening 'Beerex' ..06/10/07.

Construction duo 31271 posed with the SELG's excellent 33063 inbetween duties at Wansford..07/10/07.

 


© A1A Locomotives Ltd | Site Design by Novamarque