A1A Locomotives Ltd "Keeping Brush Type 2 Traction Alive"
Preservation Story Away Workings MRC Butterley Archive Gen

Last Updated 14/01/12

 

  FOLLOWING A TROUBLE FREE 2011 AT LLANGOLLEN, 31162 IS NOW 'WINTERISED'.

 

Current Location: Llangollen Railway, North Wales
Status:

Out of traffic (winterised)

 

Planned Workings

2012 roster .

Planned Maintenance Routine

 

The ' Spanner Mk 1' train heating boiler has now been 'isolated' due to requiring its 10 yearly overhaul.

B exam carried out 13/03/11 at Elsecar.

Next B exam due 03/12 at Llangollen.

 

                                             LLANGOLLEN RAILWAY 28/05/11

A 'seminar' takes place upon 31162's arrival at Llangollen with many of the railways' diesel group present !

Carrog is the present terminus at the 'other end' of the line where 31162 is running round its train ready to head back to Llangollen again.

During its booked stop, 31162 stands at Glyndyfrdwy en-route to Llangollen.  All photos by Steve Harvey


© A1A Locomotives Ltd | Site Design by Novamarque